98精品国产高清在线看_久久久无码精品亚洲日韩按摩l_2024国产手机在线精品_国产白丝在线视频_无码激性爽啪啪一二三区_特级毛片永久久免费观看_美色av一区二区_先锋影音中文字幕_韩国一级在线观看_中文字幕午夜福利电影

XJ350 Workover Rigs

The XJ350 (60-ton) workover rig is suitable for minor workover operations at a well depth of 4000 meters using Φ73mm externally thickened tubing, major workover operations at a well depth of 3200 meters using Φ73mm drill pipe, and at a depth of 2500 meters using Φ88.9mm drill pipe. The XJ350 (60-ton) workover rig uses a special vehicle chassis for its mounting. The drum comes in two forms: single-drum and double-drum. The winch's auxiliary brake can be equipped with an air-controlled disc brake as an option.

Product Features

Product Parameters

Operation Depth (Minor Workover)

4000 m (27/8" thickened tubing)

Operation Depth (Major Workover)

3200 m (27/8" drill pipe)

2500 m (31/2" drill pipe

Rated Hook Load

600 kN

Maximum hook load

900 kN

Power Rating

350 hp

Derrick Height (Clear Height)

31.7 m

Travel System

3×4

Chassis Drive Configuration

8×8

Wireline Diameter

φ26mm

Transport Dimensions

17.2 m×3.1 m×4.28 m

Maximum Driving Speed

60 km/h (speed limit 45 km/h)

Minimum Turning Radius

15 m

Total Weight in Transport State

42000 kg (total weight varies with different configurations)

Operating Temperature Range

-29~+50 ℃

Operating parameters

Optional Configuration

Download

>Contact Us

Headquarter

  • Company Name:Hubei Petrokh Machine Manufacturing Co., Ltd
  • Address:No.16 Jiuyang Avenue, Jingzhou City, Hubei Province, China
  • Tel:+86 716 8268511
More information